NetApp AFF, Dell PowerStore and PowerScale, HPE Alletra and backup appliances — block, file and object storage sized to the workload, with OEM warranties and honest lead times.
| Platform | Type | Best for | Availability |
|---|---|---|---|
| NetApp AFF A-Series / C-Series | All-flash (ONTAP) | Performance file+block, AI datasets; C-Series = best $/GB | Short lead times |
| Dell PowerStore | All-flash unified | Virtualization datastores, mixed workloads | 3–5 weeks BTO |
| HPE Alletra / Primera | All-flash | Mission-critical with 100% availability guarantee | 3–5 weeks BTO |
| Dell PowerScale (Isilon) | Scale-out NAS | Unstructured data, media, AI training sets | 4–6 weeks |
| Dell PowerMax | Tier-0 NVMe | Banking, ERP, lowest-latency block | Project quote |
| NetApp FAS / nearline | Hybrid | Backup targets, secondary tiers | Short lead times |
| HPE StoreOnce / Dell Data Domain | Backup appliance | Deduplicated backup, ransomware-resilient | 3–5 weeks |
| NetApp StorageGRID | Object (S3) | Archives, data lakes, S3-compatible apps | 4–6 weeks |
Stock rotates daily — positions are "typically available" and confirmed per request, usually within one business day. Stock guides →
SAN (block) suits databases and hypervisor datastores; NAS (file) suits shared folders and AI/analytics datasets. Modern unified arrays (AFF, PowerStore) serve both — we size by workload profile, not acronym.
Send capacity (usable TB), workload type (VM/DB/file/backup), performance targets (IOPS/throughput/latency) and growth horizon. We return 2–3 sized options with effective-capacity math shown, within one business day.
Yes — expansion shelves, OEM-tray drives and upgrade kits for NetApp, Dell and HPE arrays, including previous generations still in production use.
Yes — authorized-channel sourcing with OEM warranty registered for your region. Serial numbers verifiable with the vendor before payment.
We deliver DDP with customs cleared. Typical delivery: 2–5 days GCC, 5–10 days Africa for stocked items; arrays usually ship from factory order in 3–5 weeks.
Part numbers or workload description. Pricing, availability and delivered lead time within one business day.