Home / Hardware / DC Infrastructure

Data center infrastructure — power, racks and cooling

The physical layer your compute depends on: racks, intelligent power, UPS and cooling — specified together with the IT load so nothing arrives mismatched.

What we supply

CategoryRangeNotesAvailability
Racks & enclosures42U–48U, 600–800 mmSeismic and airflow-managed optionsFrequently stocked
Intelligent PDUsMetered / switched, 16–63APer-outlet monitoring, IP managementShort lead times
UPS systems1–200 kVA, online double-conversionN+1 designs, lithium options2–4 weeks
Precision coolingIn-row, rear-door HXFor 15–40 kW racksProject quote
Liquid cooling readinessDLC manifolds, CDUsFor H200/B300-class GPU racksProject quote
Structured cablingCopper & fiber trunksPre-terminated to your elevationShort lead times
KVM & consoleIP KVM, serial consolesOut-of-band managementShort lead times

Typical projects

New data hallRacks + PDU + UPS + cabling, one BOM with the servers.
→ Power budget math included
GPU rack retrofit30–40 kW racks need rear-door HX or DLC — we spec both.
→ See liquid cooling guide
Edge sitesCompact racks with UPS and remote management.
→ From ~$5k per site kit
Power auditOutgrowing your PDUs before your compute.
→ Metered PDU refresh plans

Availability and pricing anchors

from $1.5k42U rack
1 BOMinfrastructure quoted with the IT load
15–40 kWrack densities we design for
DDPdelivered with customs handled

Stock rotates daily — positions are "typically available" and confirmed per request, usually within one business day. Stock guides →

Frequently asked questions

Can you calculate power and cooling for my rack plan?

Yes — send the equipment list; we return per-rack power budgets (W and BTU), PDU schedules and UPS sizing with N+1 options.

Do GPU racks really need liquid cooling?

Above ~30 kW per rack, air alone struggles. H200 PCIe nodes can stay on air with rear-door heat exchangers; B300-class density usually means direct liquid cooling. Our guide covers the decision tree.

Can infrastructure ship together with servers?

Yes — consolidated shipment, one customs clearance, racks arrive before or with the IT load on a staged schedule.

Which UPS topology do you recommend?

Online double-conversion for IT loads. Lithium batteries where space and 10-year TCO matter; VRLA where capex rules. Both quoted.

Do you do installation?

Through integration partners at major destinations — or we deliver rack-ready kits with elevations and cable schedules for your local team.

Send your spec — get a firm quote

Part numbers or workload description. Pricing, availability and delivered lead time within one business day.

sales@haink.org