Haink supplies NVIDIA B300 servers, GB300 NVL72 racks and H200 for your project. If you do not have a site with the power and cooling they need, we can place the cluster with our Tier 1 data-center partner in the United States or Asia-Pacific, in the country you choose, and finance defined projects.
Price per server is the easy part. Projects are decided on whether the capacity will really be there, whether the data stays yours, and what the cluster will earn or save.
Capacity shown is available as of September 2026 and is reserved for a project once contracted. How supply is committed: How NVIDIA GPU allocation works →
Capacity available with our Tier 1 data-center partner for new projects, September 2026. Hosting is optional: we deliver just as well to your own site or a facility you choose.
| Location | Capacity | Cooling | Ready |
|---|---|---|---|
| United States | Sized per project | Air and liquid | On request |
| El Salvador | Sized per project | On request | On request |
| Hong Kong | 2 MW | Liquid-cooling ready | Now |
| Kuala Lumpur, Malaysia | 2 MW air + 2 MW liquid | Air and liquid | Now |
| Johor, Malaysia | 2 MW air + 2 MW liquid | Air and liquid | January 2027 |
| Jakarta, Indonesia | 2 MW | Liquid-cooling ready | Now |
| Manila, Philippines | 2 MW | Confirmed per project | Now |
| Tokyo, Japan | 3 MW | Liquid-cooling ready | Now |
| Osaka, Japan | 2 MW | Confirmed per project | Now |
| Sydney, Australia | 3 MW | Confirmed per project | Now |
For scale: 2 MW holds roughly 120 eight-GPU B300 servers, about 960 GPUs, or about 13 GB300 NVL72 racks at 132 kW each, with headroom for networking and storage. Every destination has its own export and import regime: advanced data-center GPUs for installation in Hong Kong need a US export licence, while a US site needs none. Colocation and energy cost by location: AI server cost →
How this compares with public cloud: Private AI vs cloud AI →
Two ways a dedicated cluster pays: it replaces rented GPUs for your own product, or it sells capacity to others. Both come down to utilization.
| Owned cost per GPU-hour | 3 years, 70% used | 3 years, 90% used | 5 years, 70% used | Market rental, Sept 2026 |
|---|---|---|---|---|
| B300 | $5.69 | $4.43 | $4.59 | $6.80 blended index |
| H200 | $3.35 | $2.60 | $2.75 | $3.30 index · $4.62 settled trades |
Owned cost: server at the middle of its range, plus 15% for fabric and storage, plus colocation, energy and support, less conservative resale value. Rental rates: Silicon Data index 24 September 2026, Ornn Data H200 benchmark 27 September 2026. Indicative, not a quote. Run your own numbers in the cluster cost calculator →
| Layer | What we deliver |
|---|---|
| Compute | HGX B300 servers or GB300 NVL72 racks; H200 servers or H200 NVL nodes where they fit the workload |
| Fabric and storage | 800G InfiniBand or Spectrum-X, all-flash or parallel storage sized to the GPU count |
| Site (optional) | Colocation with our Tier 1 partner: space, contracted power, cooling and remote hands |
| Delivery | End-user documentation, export and import paperwork, freight and customs |
| Bring-up | Installation, burn-in and acceptance before handover |
| Payment | Purchase, or financing that can cover hardware and colocation together |
Several stages run in parallel. The detailed breakdown by cluster size: GPU cluster deployment timeline →
Yes, once contracted. The capacity listed is available at the date shown; power, space and cooling are reserved for your project in the colocation contract.
No. Hosting is an option. We deliver the cluster to your own site or any facility you choose; the Tier 1 partner capacity is there if you need a place with the power and cooling a B300 cluster requires.
You do, or the financing structure agreed for the project holds title until it is paid. Either way you are the end user of record, and the same end-user review applies.
Yes, for defined projects: a known end user, a defined use and a defined site. The structure is agreed per project and can cover hardware and colocation together.
NVIDIA B300 servers and GB300 NVL72 racks for new clusters, and H200 where a lower entry cost fits the workload. B200 and H100 are supplied on request. See B300 vs H200 vs B200 vs H100.
Every destination has its own export and import rules, and all orders go through end-user screening. A US site needs no export licence; advanced GPUs for Hong Kong or Mainland China need a US export licence.
Tell us the workload, where it should run and when. We come back with the platform, a costed bill of materials, a partner hall with capacity, a realistic timeline and the financing options.
Not ready yet? Ask a question