NVIDIA B300 servers and GB300 NVL72 racks for new US clusters, with H200 where a lower entry cost fits — on Supermicro, Dell, HPE and Lenovo, delivered DDP. A US site needs no export licence.
Haink is US-incorporated and bills in USD. B300, GB300 NVL72 and H200 are supplied through allocation to documented projects, not from a shelf — our clients get priority on the allocation we secure, with realistic delivery dates.
| Platform | Spec | How it is supplied |
|---|---|---|
| HGX B300 | 8 × B300 288 GB, ~14.5 kW; liquid at cluster density | Allocation to documented projects |
| GB300 NVL72 | 72 × B300 in one liquid-cooled rack, ~132 kW | Project-quoted as a complete rack |
| HGX H200 | 8 × H200 141 GB, ~10.2 kW; air-coolable | Project order; lower entry cost |
| H200 NVL nodes | 2–4 × H200 NVL PCIe for inference | Project order; standard air-cooled racks |
| HGX B200, H100 | Previous platforms | On request |
| Server platforms | Supermicro, Dell, HPE, Lenovo | Chosen per project |
| Fabric | 800G / 400G InfiniBand, Spectrum-X, ConnectX | Planned with the cluster |
| DGX Spark, RTX PRO 6000 | Desk-side and workstation AI | Usually available |
How a project runs: our procurement process → · What to prepare: what we ask before a supply request →
Yes, through allocation to documented projects rather than from a shelf. End-user documentation and supplier review take 1–2 weeks; the delivery date follows the channel's commitment and your site's readiness.
Supply of current NVIDIA GPUs is limited. Haink's clients get priority on the allocation we secure — an established relationship means more reliable access than the open market.
Yes — delivered DDP to your US facility, export-screened and billed in USD, with OEM warranties; from a single server to a full cluster.
Supermicro, Dell, HPE and Lenovo HGX B300 and H200 systems, NVIDIA DGX, and GB300 NVL72 racks — chosen per project with NVIDIA fabric.
Yes, as an option. We can place it with our Tier 1 data-center partner in the US, sized per project — see GPU cluster hosting.
Running AI on this infrastructure? Haink also builds the LLM & ML software that runs on it — model, pipeline and GPUs under one contract.
Tell us the workload, the site and the target date — we come back with the platform, a costed bill of materials and a realistic timeline.
Not a quote? Ask a question