Deployment stories — shipped, screened, supported

Representative engagements across private AI, networking, cloud-exit and data-center delivery. Client details are anonymized under NDA; figures reflect typical outcomes for these deployment patterns.

Selected deployments

Private AI · Singapore

AI startup serving its own LLM

A Singapore AI startup needed H200-class inference capacity in weeks, not the multi-month wait an HGX allocation implied. We configured PCIe GPU nodes with NVIDIA H200 NVL — passing end-user screening in 48 hours — and delivered a running node specification with networking and cooling guidance. Compliant, fast, and on PCIe to skip the allocation queue entirely.

9 days PO to delivery, screening included2 weeks to first model served4× H200 NVL across 2 inference nodes
Networking · GCC

Fintech branch-network refresh

A Gulf financial institution refreshed network and security across 30 branches. We staged FortiGate NGFW and Cisco Catalyst switching with consistent firmware, labeled per site, and shipped DDP branch-by-branch on the rollout schedule — no site waiting on another, customs cleared by us.

30 sites staged over 6 weeks1 firmware baseline across all unitsDDP customs handled per site
Cloud exit · East Africa

Regional cloud provider repatriates workloads

A regional cloud provider moving steady workloads off public cloud needed 40 virtualization hosts plus all-flash storage, delivered to two data centers. We consolidated the shipment in Dubai, shipped DDP with certificates of origin, and cleared destination customs — the buyer signed once, at delivery.

40 hosts + all-flash storage~20% below local distributor pricing2 sites staged delivery
AI workstations · Singapore

R&D team builds local LLM capability

An R&D group wanted private LLM development without cloud exposure. We delivered a fleet of NVIDIA DGX Spark units and RTX 6000 Ada workstations — screened and compliant — within the week, so the team prototyped on-prem from day one.

1 week fleet delivered0 cloud fully on-premisesDGX Spark + RTX 6000 Ada builds
Compliance · Central Asia

University campus network, done legally

A university needed a Cisco campus network in a market with non-trivial import and screening requirements. We ran end-user screening, prepared full export documentation, and delivered DDP in 5 weeks — the hardware others said was 'too complicated to ship,' delivered properly.

5 weeks screening to deliveryFull docs export + customsCampus-wide Catalyst switching
Data center · Southeast Asia

Telco data-hall build-out

A telecom operator building a new data hall needed racks, intelligent power and servers as one coordinated delivery. We quoted the full BOM together — power budgets calculated up front — and shipped in deployment order so racks arrived before the IT load.

1 BOM racks + power + computeStaged deployment-order shippingPower-planned per-rack budgets up front

Representative deployments. Specific clients, exact volumes and pricing are anonymized or generalized under confidentiality agreements; we provide verifiable references on request for qualified buyers.

The pattern behind every one

Screen firstEnd-user and destination compliance before anything ships — especially for controlled GPUs.
Source authorizedOEM-certified hardware, serials verifiable before payment. No gray market.
Stage & ship DDPPre-configured, labeled, customs cleared — delivered in deployment order.
Support afterOEM warranties and a single contact for RMA and expansion.

Want a deployment like these?

Tell us the workload and destination — we reply with an approach and quote within one business day.